Energy Centre delivery
Energy Centre delivery
On 1 September 2020 we are due to install the 14-tonne energy centre to the new Leisure Centre, which powers the Leisure Centre and Academy buildings.
Due to the size of the load the vehicle delivering this we will need to have a police escort and delivery out of hours to ensure that we are keeping the general area free from excessive traffic and disruption.
Full details of the delivery can be found here.