Trial Holes Grange Street
Trial Holes Grange Street: Towards the latter part of 2020 we will be commencing work on Grange Street to form the new public realm adjacent to Shoreditch Park and Shoreditch Park Primary, as part of our contracted works for the Britannia Leisure Centre.
Prior to these works taking place, we need to conduct some investigation works within the coming week to ensure we are aware of what lays beneath the concrete on Grange street and we will be doing this by excavating three trial holes. The perimeter of the holes will be 1.5 metres by 1.5 metres in diameter.
The work will take place from the 27 January 2020 – 03 February 2020 for one week’s duration and will only commence after the school day has begun at 9:30am and will end by 3:00pm to ensure full access is available during school drop off and pick up times. As always, these works have been discussed with the school prior to commencement and will always be overseen by Morgan Sindall Construction’s management. Herras fencing and signage will segregate the public from the construction works. The below image shows approximately the location of the three trial pits.